Based on what is appropriate to support the business requirements and growth objectives, ASAP's experts recommend a combination of various automated equipment, technology, manual processes and people. We work closely with your team for a high level of participation in the design process so that each evaluation is tailored to your needs.
Design efforts focus on:
- Increasing productivity
- Meeting processing throughput requirements
- Reducing operating costs
- Improving customer service levels
ASAP Automation has developed a well-defined five phase methodology to performing engineering studies that can include:
Phase 1—Project Kick Off and Data Gathering
- Kick off meeting with project team to understand management design goals and critical success factors
- Data requirements gathering
Phase 2—Current System Assessment
- Current layout, material flow diagram and information flow diagram
- Document current operational processes and constraints
Phase 3—Conceptual Evaluation
- Confirm design parameters and assumptions
- Prepare conceptual layouts and alternatives for automation equipment
- Review capital requirements and manning requirements for alternatives
- Identify system throughput constraints and scalability
Phase 4—Recommended System Model
- Warehouse simulation to verify material flow and manning
- Slotting and profile analysis to select appropriate automation technology
- Description of operations
Phase 5—Final Report
- 3D CAD layout
- Capital requirements
- Description of all equipment
- Return on investment (ROI) analysis
- Implementation plan
- System rendering with panoramic views
All form fields are required.

