"Exacta orchestrates our order entry, production planning and error proofing systems to ensure that we ship the correct products 100% of the time. It performs data analysis and management to ensure all tire and wheel assemblies shipped by Astra meet or exceed the customer’s expectations" - Bruce Muir, PE, Vice President of Astra Logistics

System Summary

DaimlerChrysler Corporation was transforming the company’s 3.4 million square foot Newark Assembly Plant into a Flexible Manufacturing Facility (FMF).Astra Logistics, a tier one automotive supplier located in Delaware, was awarded the contract to build and deliver tire and wheel assemblies to the Chrysler Plant in Newark on a just-in-time basis.

Business Challange

  • Chrysler needed to receive a wider range of wheel and tire styles that could be updated in real time.
  • Astra needed to minimize the amount of floor space leased and the amount of purchased parts inventory managed to reduce operating costs.
  • Cycle times had to be quick, yields needed to improve to reduce rework and scrap, and plant labor hours needed to be reduced.
  • Machine life had to be extended to minimize capital spending.
  • Product history data had to be captured and archived in a cost- effective and efficient manner.

Solution

  • ASAP integrated its Manufacturing Execution Software, Exacta LINK software with a wide variety of enterprise applications and shop-floor process control systems.
  • ASAP’s Exacta LINK Manufacturing Execution Software provided access to real-time Chrysler production data.
  • Astra Logistic experienced a reduction in manufacturing cycle times, as well as a reduction in WIP inventories and their associated capital requirements with the new system.
  • Visibility improved across the operation with Exacta Console Digital Dashboard.
  • Paper processes were eliminated and relevant reporting and analytics were provided.